Electricians installing cable trays on a data centre construction site in Finland — electrical installation jobs

For contractors and user companies · Finland (EU)

Workforce & subcontracting for data-centre construction in Finland

Verified trades for data-centre builds — employed by us, documented for the inspector.

Two ways to work with us

Workforce — we are the employer

Verified installers on your site, employed by Gene-Works Oy under Finnish law and the applicable collective agreement. Direction and supervision of the work are yours; pay, insurance, working-time records and right-to-work checks are ours. Price per paid hour with an open structure.

Subcontracting — we take the work package

A defined package of work under our own responsibility: cable pulling, cable trays and supports, roofing, sandwich panels, façades, steel and support structures, mechanical installation, construction cleaning, site logistics, material handling, winter maintenance and other supporting works. Who runs the work on site is set by the contract for the package — our own foreman or your supervisor.

RECRUIT → VERIFY → PREPARE → MOBILISE → MANAGE → REPORT

  1. RECRUITEuropean recruitment
  2. VERIFYQualification check
  3. PREPAREFinnish compliance
  4. MOBILISEAccommodation and transport
  5. MANAGESite coordination
  6. REPORTDocumentation

Housing and transport — our own, not the local rental market

We hold housing capacity for up to 400 people near Kajaani and Kuhmo and run our own transport to site by shift. That is what makes a large crew possible on the northern sites at all: near them the rental market is thin, and a crew that has nowhere to sleep does not arrive.

Elsewhere accommodation is arranged per assignment, and so is the employer's insurance cover for the people on it. For trades we have in the pool with the right to work in the EU, installers are typically on site 1–3 weeks after arrival: the tax number (1–3 working days by the Tax Administration's own estimate) and card delivery set the pace. The exact start date for your site is fixed in the written offer.

Modular worker accommodation camp for construction crews near a Finnish pine forest in winter, minibus for shift transport

The client page — see it with sample data

Sign in with a one-time link to the work e-mail from your enquiry, no password. For every worker on your site you see the state of each requirement, the date it was checked and how long it is valid. One button gives you a statement for the labour inspectorate with the gaps named. Hours and pay states come after the pilot, and we do not show them as working.

Open the sample client page See a sample inspector statement

Who answers for what under Finnish law, the seven documents you are required to obtain under 1233/2006, the evidence you receive and what each state in the client view means.

Safety and compliance

Open price structure — six elements you see for every paid hour

  1. Collective-agreement rate

    The pay group and hourly rate under the applicable agreement, by name and date of validity.

  2. Supplements

    Evening, night, qualification and foreman supplements as the agreement defines them.

  3. Employer contributions

    Statutory employer contributions and insurance on top of gross pay.

  4. Holiday pay and separate pay components

    Holiday pay and the agreement's separate components, shown where they apply.

  5. Housing, transport, relocation, training

    Priced as separate lines, at cost basis stated in the agreement — never offset against the worker's pay.

  6. Our fee

    One line, agreed in the framework agreement. No other charges.

Why we price this way

An open structure removes the incentive to underpay: you see that the worker is paid under the agreement, and the worker sees where the client's hour goes. Public procurement in Finland already uses this model for staff leasing (framework agreement Hansel / StaffPoint, 1 March 2023 – 28 February 2027). The Court of Justice of the EU has confirmed that housing and meals may not be counted towards a worker's minimum pay (case C-396/13, 12 February 2015) — we never do.

We do not publish rates on this page: the fee depends on trade, volume, rotation and what you want included. You get the full structure with numbers in a written offer, as a rule within one Finnish working day of your request; a full offer follows once we have reviewed your requirements.

Services — and how we cover each of them

Services — and how we cover each of them
ServiceHow we cover itWhat that means
Electrical & cablingPersonnelElectricians, MV/HV fitters, cable jointers, BMS, UPS and generator technicians as leased personnel under your electrical work supervisor.
Cable pullingBothAs leased personnel, or as a work package under our responsibility.
Cable trays and support systemsBothAs leased personnel, or as a work package under our responsibility.
Roofing and fall protectionBothRoofers and fall-protection fitters, or the roofing package.
Sandwich panelsBothPanel fitters, or the panel package.
FaçadesBothPrecast and façade installers, or the façade package.
Steel and support structuresBothSteel fixers, structural steel erectors, or the structural package.
Mechanical installationBothPipefitters, pipe welders, HVAC, sprinkler, refrigeration and insulation fitters, or the mechanical package.
Material handling and liftingBothCrane operators, riggers and MEWP operators, or materials handling as a package.
Construction cleaningWork packageAs a work package under our responsibility. This trade is not in our catalogue of specialities, so we do not offer it as leased personnel.
Site logisticsWork packageAs a work package under our responsibility.
Winter maintenanceWork packageSnow clearing and site upkeep through the winter, as a work package.
Other supporting data-centre worksWork packageNamed in the contract for the package: we do not list work we have not agreed.

"Personnel" means leased workers on your site under your direction. "Work package" means a defined scope under our own responsibility, with the contract naming who runs the work. Electrical installation as our own work package is not offered on this site: the contractor registration number and the name of the responsible electrical work supervisor are not yet known here, and we do not claim what we cannot show.

Trades, headcount, site and start date — we reply within one Finnish working day as a rule.

Request workforce

Describe the package in the message field — scope, site and dates. Prices are not published on this site; the offer comes in writing with the open price structure.

Request a quote

Gene-Works Oy in one line

Available accommodation and transport are confirmed for each assignment; so is the employer's insurance cover for the people on it. Company information · 26 September 2026.

What you get

Staff leasing

Verified installers with cards and right to work, employed by us, paid under the applicable collective agreement. Price per paid hour with an open structure — no hidden items.

Task team or work package, with a bilingual foreman

A team for a defined task — as leased personnel under your direct management, or as a work package under our own responsibility, with a QA folder for the package and the contract naming who runs the work on site. Electrical installation is supplied as leased personnel working under your electrical work supervisor; we do not offer electrical installation as our own work package on this site.

Worker onboarding as a service

Tax number, Valtti card (the ID-card product we use; the law requires a photo ID with the tax number, not a particular brand), bank account, registration, tax card, safety cards; welder tests before travel; the path to recognition of qualifications. Paid by the client — never by the worker (Act 380/2023, Google Supplier Code of Conduct).

Transparent client view — included

Per assigned worker: the requirements, the state of each one, validity dates and what is still open, plus a statement for the inspector at the press of a button. Included in leasing, no separate fee.

How an assignment starts

  1. Your request

    Trades, headcount, site, start date. We aim to reply within one Finnish working day.

  2. Requirements and agreement

    We confirm the applicable collective agreement, qualification and card requirements for the tasks, and shift pattern.

  3. Written offer

    Open price structure per paid hour, mobilisation time, housing and transport plan.

  4. Mobilisation

    Right-to-work and document checks, cards, tax numbers, Valtti, housing, transport — with a status per person before day one.

  5. On site

    One coordinator, weekly documentation, exceptions with deadlines, inspector's file on request.

I'm hiring — talk to us

Tell us what you need and where. We aim to reply within one Finnish working day with the applicable agreement, a realistic mobilisation time and an open price structure.

Fields marked * are required.

What do you need?

Choose one; you can change your mind in the written offer.

Trades tell us which collective agreements apply and which of our people can be considered. A rough list is enough.

Optional. An approximate number, or nothing at all, is enough to start the conversation — we do not need a committed headcount from you.

We reply within one working day.

Request supplier documents

Tell us where to send the reply. We check the current contractor's-liability (tilaajavastuu) package and respond within one working day with dated documents, identifying anything still being completed. The package is sent by a Gene-Works specialist after a check — not automatically.

Where to send the package. We use this address for the document request and nothing else.

Questions clients ask us

Do your electricians need a Finnish S1/S2 qualification?

No — the responsible electrical supervisor (sähkötöiden johtaja) is required of the electrical contractor, not of each installer. In staff leasing our installers work under your supervisor and licence. If you need us to take a package as our own contract, we say so openly: that requires our own S1/S2, and we do not offer it.

Which collective agreement do you apply?

The order set by the Employment Contracts Act (55/2001, chapter 2, section 9): first the collective agreement that binds Gene-Works as the employer; where none applies, the agreement that binds the user company; and failing both, the terms the user company applies in practice. For electrical installation that is the electrical contracting agreement, for HVAC and piping the building-services agreement, for shell trades the construction agreement. We name the agreement in the offer and show its pay table.

Are your workers posted workers?

Our workers are employed by a Finnish company under Finnish law and Finnish collective agreements. The posted-workers regime (Act 447/2016) applies to foreign employers sending workers to Finland, which is not our model. We confirm the arrangement in writing for each assignment.

How fast can people be on site?

For trades we have in the pool with the right to work in the EU: from the confirmed order, the binding items are the tax number (the Tax Administration's own estimate is 1–3 working days with complete details; the appointment and the site's own induction come on top) and card delivery; installers are typically on site 1–3 weeks after arrival. Non-EU hires need a residence permit for an employed person and are started only against a confirmed order.

Can you send the tilaajavastuu documents before we talk?

Yes — use the request button; the package arrives with date and version, not older than 3 months, and we follow up personally, as a rule within one Finnish working day.

If you print or save this page: Gene-Works Oy, Business ID 2198820-6, Tommolankatu 9, c/o Prismakeskus, 45130 Kouvola. Prices of our services and our margin are not on this page and are not in this printout: they belong in a written offer. Figures on this page and their sources were checked on 26 September 2026; questions to info@gene-works.fi.